| The inner leaf of the cavity wall is built up to floor level, usually the house DPC |
A blinding screed of sand 50mm thick is laid over the compacted hardcore layer to prevent any sharp stones puncturing the damp proof membrane (heavy duty plastic sheeting) |
The PVCu external cill is fitted to the dwarf wall and erection of the side frames begins |